Please use this identifier to cite or link to this item: http://idr.iimranchi.ac.in:8080/xmlui/handle/123456789/483
Full metadata record
DC FieldValueLanguage
dc.contributor.authorShishodia, Anjali.-
dc.contributor.authorVerma, Priyanka.-
dc.contributor.authorDixit, Vijaya.-
dc.date.accessioned2019-04-16T10:14:31Z-
dc.date.available2019-04-16T10:14:31Z-
dc.date.issued2019-03-
dc.identifier.citationShishodia, A., Verma, P., & Dixit, V. (2019). Supplier evaluation for resilient project driven supply chain. Computers & Industrial Engineering, 129(March), 465-478.en_US
dc.identifier.issn0360-8352-
dc.identifier.urihttps://doi.org/10.1016/j.cie.2019.02.006-
dc.identifier.urihttp://idr.iimranchi.ac.in:8080/xmlui/handle/123456789/483-
dc.description.abstractProject-based organizations are increasingly becoming dependent on suppliers because of an upward trend of subcontracting and an emphasis on core competencies. Projects can be viewed as complex networks consisting of several interdependent actors, and among them, suppliers are important entities. In project-based firms, the demand of the material supply chain is driven by the material requirement of the project, which is referred to as project-driven supply chains (PDSCs). PDSCs couple off-site supply chain activities (i.e., production, logistics, and inventory) with on-site project activities (i.e., scheduling, resource planning, and allocation), and thus exposure of this integration to any disruption may impede the progress of the project. This study evaluates the resilience capacity of existing suppliers of PDSC. More precisely, the objectives of the study are to determine the factors influencing supplier’s resilience in the context of PDSCs and to compute suppliers’ resilience scores. The factors are identified using published literature and scores are computed using fuzzy linguistic guided order weighted aggregation (FLQ-OWA) technique. The proposed methodology is implemented in a real project case (construction of hospital/health care facility). The computed resilience scores enable activity-wise analysis of supplier’s resilience which in turn, helps in classifying existing suppliers in distinct groups characterized by their resilience capability and providing early warning signals to the top managers of contractor’s organization to work proactively with all corrective measures planned at the onset of the project.en_US
dc.language.isoen_USen_US
dc.publisherScience Directen_US
dc.subjectProject risken_US
dc.subjectProject-driven supply chain (PDSC)en_US
dc.subjectSupplier resilienceen_US
dc.subjectConstruction projecten_US
dc.subjectSupplier evaluationen_US
dc.subjectIIM Ranchien_US
dc.titleSupplier evaluation for resilient project driven supply chainen_US
dc.typeArticleen_US
dc.volume129en_US
dc.issueMarchen_US
Appears in Collections:Journal Articles

Files in This Item:
There are no files associated with this item.


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.